Join the discussion on the following article:
Metra completes work on Blue Island Branch stations
Join the discussion on the following article:
Metra completes work on Blue Island Branch stations
Good to hear
Finally those stations get the attention that they needed.
Metra CEO Don Orseno has made station rehabilitation projects such as these a top priority, and that effort is very much appreciated by Metra customers.
Was on the Blue Island elevated platform early June. One of the light stands was missing with just a cement block. I tripped on the block, flat down on my nose. Bleeding profusely as I’m. on blood thinner daily. Was going to walk to the hospital short distance away, but a Samaratin gave me a ride to emergency. Two stitches to close a miniscule cut. The cement block was about 4 inches high There should have been a cone
or protection over the block. They say old timers get a lot more falls. Guess I’ll just have to watch my steps.