Metro-North wins engineering award for Port Jervis Line rebuild

Join the discussion on the following article:

Metro-North wins engineering award for Port Jervis Line rebuild

With public money it only took 3 months and they got an award. The private short lines in Vermont did it in a month with their own money. Ever wonder why CSX and NS don’t hire ex Amtrak or NJ Transit employees?

With public money it only took 3 months and they got an award. The private short lines in Vermont did it in a month with their own money. Ever wonder why CSX and NS don’t hire ex Amtrak or NJ Transit employees?

Something of a difference between getting a slow speed freight line up and “passable with care” for insured cargo, and carrying fragile human beings at higher speeds.