Anyone here doing one person operations with their layout?
I am trying to do some Amtrak and Metra Chicago operations using Fred Soop’s techniques, albiet on a much smaller scale. One person operations for me is in a large bedroom around the walls dog bone layout.
I can switch between modern and 1950s at a moments notice, with the only thing unable to change is the modern backdrop. Which is just cosmetic.
Right now just as Fred Soop did, I have Metra leaving Chicago in the early morning to pick up passengers at their stations. 15 minutes to arrive at destination and 5 minutes to load/unload passengers. On the way back into Chicago Union Station, the Metra trains “back in” since they are push pull just as in the prototype. Then they go into hidden staging until evening rush hour, where they once again leave Union Station and head out to the suburbs, and then finally return to staging to await the next morning rush hour.
I am trying to figure out how to incorporate the CNW 400 commuter train into this, which is also “push/pull”. Since it ran until 1963 this should be fine to run with my NYC 20th Century Limited and Olympia Hiawatha for the 1950s, but not with modern Metra. Instead I will use Amtrak to run along with Metra for modern.
The reason, I asked about one person operations, is that I am assuming you like I are running 2 physical Amtrak locomotives with 12 passenger cars to create named trains from and 2 Metra with 9 passenger cars to choose from.
Where it gets rough is the older named trains such as the NYC 20th century (11 cars), BN Zephyrs ( 2 locos) 4 cars, and Hiawatha (11 cars).
How do you handle passenger operations like this?