I’m not very familiar with O gauge, 3 rail. I have MTH Doodlebug in O gauge I would like to run behind my 16’ foot layout point to point in a controled manner, Anyone have any ideas how I can do this. I know the trollies have this capability. Is there any after market switches / trips that would work without have to manually throwing a switch. Thank You for any help.
AZ-Flyer