Historical video now but lots of detail of how this railroad alignment came to be and is a full cab ride on the former Soo Line as well as C&NW through Oshkosh, WI courtesy of the former Wisconsin Central LTD. Interesting video to watch.
2 Likes
Is the realignment suitable to run psgr trains at 60-70mph?