Happy Holidays everyone,
After months and months and months of track planning, I hope to start some benchwork soon. Initially, all I was interested in was modeling. The more I have got into the hobby, the thought of operations has become more intriguing.
My layout will be fairly large in my opinion. Large enough to accommodate 6-8 people. I was originally planning on using tortoise machines and toggles located on panels located a various points on the layout to control turnouts. I am now wanting a dispatcher desk with a centralized CTC panel. Not sure if that will be a physical panel or a computer using JMRI PanelPro yet.
My mainline will be mostly single track with some passing sidings, but there will be some double tracks. In your opinion, should the CTC panel control just the mainlines? This would leave yards and siding turnouts controlled by operators at panels located on facia at varios points. I just don’t see the whole layout controlled by dispatch being a good idea.
Your thoughts?
Ed